Diesel Generators & ATS Systems
Reliable Prime & Standby Power Generation with Woqod & Kahramaa Compliance
Engineering Overview
Qatar Approved EngineeringUninterrupted power is vital for data centers, hospitals, financial institutions, security installations, and industrial operations. BANAN International provides complete turnkey diesel power generation systems across Qatar, supporting both standby emergency backup and continuous prime power duty.
We supply, install, and commission world-leading generator sets powered by Perkins, Cummins, Baudouin, and Volvo Penta engines paired with Stamford and Leroy-Somer alternators. Our capabilities include custom Automatic Transfer Switch (ATS) design, multi-generator synchronizing and load-sharing switchboards, heavy-duty acoustic soundproof enclosures, remote telematics, and resistive load bank testing.
Scope of Works & Deliverables
Every project is delivered as a complete turnkey solution executed by certified in-house engineering teams:
Our 5-Step Project Execution Lifecycle
We maintain structured quality gates from initial design calculations to final authority handover:
Load Analysis & Power Sizing
Analyzing inrush currents, motor starting kVA, harmonic distortions, and critical branch circuits.
Civil Pad Design & Mechanical Layout
Reinforced concrete foundation sizing, spring isolators, airflow calculation, and exhaust routing.
Rigging, Positioning & Electrical Tie-In
Crane lifting into position, main power cabling, ATS integration, and earth pit grid connections.
Step Load Bank Testing (0% to 110%)
Four-hour continuous load testing verifying oil pressure, coolant temperature, frequency, and voltage stability.
Live Blackout Simulation & Handover
Testing simulated Kahramaa grid power loss, verifying automated generator crank, ATS transfer, and re-transfer.
Key Advantages & Assurance
Authorized engineering practices with genuine Perkins, Cummins & Stamford parts
Ultra-fast automatic mains failure (AMF) transfer within 8-10 seconds
Turnkey civil foundation, vibration isolation, and exhaust silencer engineering
Custom fuel integration with Woqod-approved bulk tanks and automated supply skids
Codes, Standards & Authority Compliance
Strict adherence to Qatar statutory regulations and international engineering guidelines:
Frequently Asked Questions
Our configured ATS systems start the generator and transfer critical electrical loads within 8 to 12 seconds of grid voltage loss, ensuring vital systems remain operational.
Ready to Start Your Diesel Generators & ATS Systems Project?
Our Grade-A certified engineers are ready to assist with design, authority approvals, and installation across Qatar.